Pagination
Voir le détail
Curran, J.J. 1842-1909, (John Joseph)
its opening in 1847 — Rev.Father O'Farrell (Now Bishop) " " Brown." " Bakewell." " Toupin." " M.Callaghan." " J Callaghan." " CJuinlivan.' " Liclaire.The present staff of the Church is :- Rev.Father Richards." " Connolly." " O'Connell." " Morgan." " McCullough " " MacMahon " " Dowd." " O'Brien." " Hogan.Rev.P.Dowd
Del Castillo, Maria Fernanda
., Froyland, G., 2008.A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology.Coward, S., Dowd, P., Vann, J., 2013.Value chain modelling to evaluate geometallurgical recovery factors, in: Inter- national Symposium on the Applications of Computers and Operations Research in the
, P., 1997.Risk in minerals projects: analysis, perception and management.Trans.Inst.Min.Metall.Sect.A-Mining Ind.106, A9–A18.Dowd, P., 1994.Risk assessment in reserve estimation and open-pit planning.Int.J.Rock Mech.Min.Sci.Geomech.Abstr.4, 168A.Dowd, P., Xu, C., Coward, S.J., 2016.Strategic mine planning and design
. Traditional and new MIP models for production scheduling with in-situ grade variability. International Journal of Surface Mining, 18(2), 85–98. [12] De Neufville, R., and Scholtes, S., 2011. Flexibility in engineering design. MIT Press. [13] Sepulveda, E., Dowd, P. A., Xu, C., and Addo, E., 2016. Multivariate Modelling of
Brika, Zeyneb
(2002).Dimitrakopoulos, R., Ramazan, S., Stochastic integer programming for optimizingong-term production schedules of open pit mines: methods, application and value of stochastic solutions.Min.Technol.117(4), 155–160 (2008).https://doi.org/10.1179/174328609X417279.Dowd, P., Risk assessment in reserve estimation and open
, S.: Stochastic integer programming for optimizingong-term production schedules of open pit mines: methods, application and value of stochastic solutions.Min.Technol.117(4): 155–160.(2008).Dowd, P.: Risk assessment in reserve estimation and open-pit planning.Transactions of the Institution of Mining and Metallurgy (Section
Kumar, Ashish
simulation of multiple correlated variables.Mathematical Geo- sciences, 41(2), 215–237.Boucher, A., and Dimitrakopoulos, R.(2012).Multivariate block-support simulation of the Yandi iron ore deposit, Western Australia.Mathematical Geosciences, 44(4), 449–468.Coward, S., Dowd, P.and Vann, J.(2013).Value chain modelling to
Farmer, Iain
series methods in metal price forecasting.Resources Policy, 30(3), 208–217.Dowd, P.(1994).Risk assessment in reserve estimation and open-pit planning.Transactions of the Institution of Mining and Metallurgy(Section A: Mining Industry), 103.Duan, J.-C., and Simonato, J.-G.(2001).American option pricing under GARCH by
Freitas Silva, Mario de
.Inst.Min.Metall.A), 117(4), 155–160.Dimitrakopoulos, R., and Jewbali, A.2013.Joint stochastic optimization of short- andong- term mine production planning: Method and application in aarge operating gold mine.Min.Technol.(Trans.Inst.Min.Metall.A), 122(2), 110–123.Dowd, P.1994.Risk assessment in reserve estimation and open pit planning
Carpentier, Sabrina
forward from traditional optimisation: Grade uncer- tainty and risk effects in open pit mine design.Mining Technology, 111(1), 82–88.Dimitrakopoulos, R.2011.Stochastic optimization for strategic mine planning: a decade of developments.Journal of Mining Science, 84, 138–150.Dowd, P.A.1994.Risk assessment in reserve estimation
Senécal, Renaud
) Uncertainty based production scheduling in open pit mining.SME Transactions, 316, 106–112.Dowd, P.(1997).Risk in minerals projects: perception, analysis and management.Transactions of the Institution of Mining and Metallurgy, 106, 9–18.Dowd, P.A., and Kumral, M.(2005).A simulated annealing approach to mine production planning
Lamghari, Amina
111:A82–A88. Dimitrakopoulos, R., Ramazan, S. (2004) Uncertainty based production scheduling in open pit mining. SME Trans- actions 316:106–112. Dowd, P. (1994) Risk assessment in reserve estimation and open-pit planning. Transactions of the Institution of Mining and Metallurgy 103:A148–A154. Dowd, P. (1997) Risk in
Kumral, Mustafa
–914. Kumar, U., Huang, Y. (1993) Reliability analysis of a mine production system – A case study, In Proceedings of Annual Reliability and Maintainability Symposium, 167–172. Kumral M., Dowd P.A. (2005) A simulated annealing approach to mine production scheduling, The Journal of the Operational Research Society, 56(8
: right rer.Hu Grace Elxéar Alexandre Tascbenmu, Archbishop of Quebec : right ter.Charles Larocque, bishop of St.Hracintbe: right rev.Jean Langevin, bishop of Rimouski ; Côœc Séraphin Cberrier, Q.L\ LL.D.; rev.Patrice Dowd, P.P., St.Pa trick’s church, Montreal ; Louis L.L.D.sauL niers, M.D.; Cyrille Delagrave ; rev
.Pre»o«t, curé.V.Rousselot, F.Da niel, J.J.Perrault, J.t.Ucan, C.Desroaznres, C.J.Bardey, C.D.Tambareau, C.Lenoir, P.Dowd, P.McCul-a, M.O’Bnen, P.Murphy, Halley.St.Peter’s Church.Revds Fathers Santoni: superior, J B Honorât, Léonard, Lagier, Rouge, Rouisse, Antoine, Royer.Ecclesiastical Seminary.Revds J Bayle, D Granet
., Henry H.Miles, LL.D., D.C.L., joint-secretary.Catholic members (forming the Roman Ca tholic committee of the council), Jacques Cr6- mazie, LL.D., president ; right rev.Charles La rocque, bishop of St Hyacinthe; right rev.Jean Langevin, bishop of Rimouski ; Come Séraphin Cherrier, Q.CM LL.D.: rev.Patrick Dowd, P.P., St
, Edmond-P.Dowd, qui a décidé de toujours voire bon côté des choses et des gens.Harveyeapin blanc et Edmond nous en feront voir de touteses couleurs.Ils sontes catalyseurs autour desquelses différentes pièces du puzzle viendront s'imbriquer.Harvey racontees efforts prodigués par une veuve, Marie-Louise Simmons
.Billaudèle.V.G.; R.Larré, T.Arraud.L.Regourd, L.Ville- neuve.B.Granjon, J.Tmrpin, A.Nercam, E.Picard, M.Bénissant, L.Barbarin, A- Mercier, J.Aoustin, L.Pellissier, J.J.Con nolly, H.Prévost, curé d’Office, V.Roussc-on, F.Daniel, H.Lenoir, J.Perrault, 0.Desmazures, C.J.Bardy, D.H.Tambareau, Econome; P.Dowd, M.O’Brien, P.Rous seau, R
., Director, collegeMontreal.Dequoy, J.Chateauguay.Désautels, J.Varcnnes.Désastels, J.J., Director, college Masson.Terrebonne.Desmazures, C., seminary.Montreal.Desmarais, E.St.Calixte.Després, —., R.P., Ste.CroixSt.Laurent.Dorval, E.L’Assomption.Dowd, P., seminary.Montreal.Drapeau, J.B.Longue Pointe.Dubé, P.0.St.Martin, Isle